Greenboard Accessories

NRG Greenboard 40mm – 60mm – 75mm
Showing unique diagonal grooving system – Advantages better key for rendered surface, in addition to allowing the inner surface to breath against the sarking membrane.


3mm Render Bead

Application, used in composite construction i.e. fibrous cement, textured sheeting adjoins Greenboard finished surface.15 Sill Bead x 40mm & 60mm width x 6mm build x 3000mm
Reveal Bead 40mm – 60mm – 75mm
width x 6mm build x 3600mm – Application, Window Reveals/Control Joints
Starter Bead 40mm – 60mm – 75mm
width x 6mm build x 3000mm – Application, slab, high set, above  roof
Stud Fixing & Washers
Timber Fixing and Metal Fixings

 N.B. Screws are to be Galvanised or Treated (Class 3)

 All NRG PVC Washers and Fixings are required at 300mmMaximum centres – Refer to Page 9 DWG 1.0

 Extreme environments – consideration should be given to

the use of T316 Stainless Steel Fixings

Foam Adhesives
Application – Installation of both Sunhoods & Blades, ideal for filling minor chip corner etc.
Powers – Expanded Trigger Foam
Power(s) Foam Cleaner(s)x

Masonry Fixings
a simple but effective method of fixing Greenboard to masonry surfaces

NRG Greenbaord Mesh
Reinforced, alkali resistant, fibreglass 160g/m mesh

NRG 3B Greenboard Reinforced Render
Modified polymer cement render. Just add water.

Sunhood & Blades Fixing
Sunhood & Blade Fixing
Galvanised Brackets
Coach Screws (Timber)
Anchor Bolts (Masonry)
Purlin Bolts (Steel)

Waterproofing Membrane
Apply over finished rendered surface to waterproof NRG Sunhoods … prior to application of texture paint finish.

Find Out More

NRG Greenboard Installation Guide

This guide provides information on the correct procedures for the installation of NRG Greenboard The details are provided to assist carpenters/ installers and cover most common applications.

START

(A) Before commencing to fix NRG panels check that

i. The frames are straight and plumb

ii. All windows and flashing are correctly installed

iii. Breathable sarking has been fitted

iv. Solid back blocking where required

Consideration should be given to the installation of wall mounting accessories i.e. taps, electrical, fittings etc.  It is important to allow for adequate back blocking for these items.

(B) POSITIONING OF STARTER BEAD:

FIXING / CUTTING / BACK BLOCKING

(A) NRG panels can be layed horizontally or vertically depending on what suits the job.
• Position NRG panel into starter bead, check for level and fix into studs using NRG washers and screws.

• Standard fixings are 300c vertically and 450c horizontally  (refer to fixing table)

(B)  Adjoining NRG panels are to be glued on both horizontall and vertical edges using recommended construction adhesive (i.e. Bostik No More Nails) or an expanda foam.

(C) Measure and cut NRG panels using a straight edge and a standard power saw with a masonary diamond blade.

(D) At external corners, NRG panels are overlapped the full thickness of the sheets and glued using recommended construction adhesive.

(E) Allow a 3mm gap between NRG panels and openings (door, windows) for sealing.  It is recommended the straight edge of the sheet be fixed next to the openings for easier sealing.

BACK BLOCKING

(F) Where the NRG panel has a vertical join off a stud it is necessary to back-block as follow.

i. Fixing stud material vertically (widest facing outwards) and securing between bottom plate and noggin.  Alternately between noggin and top plate, making sure to glue both NRG panels and fix through each panel with screws and washers into back block at 300c.

(G) Fill any gaps or holes with expanda foam.

3 BEADING & SEALING

At this point particular care needs to be exercised to ensure that the installation of all beading around windows and doors is completed correctly.  This is not a gap filling exercise but an intregral part of the total NRG Greenboard walling system.

(A)  Rendered Reveals 60mm, 75mm, 100mm Greenboard

i.   All sills, heads & jambs to be rendered.

ii.  Using marking tape, accurately adhere to frame of joinery, 4mm from the edge creating a neat parallel margin.

iii.   Using Bostik Primer 5077, and a clean rag, dampen cloth with Primer and quickly clean the window reveal, ready for sealant application.

iv.   Cut a medium size end off the nozzle of the sealant.  Apply a bead of sealant into the gap between the Greenboard and the taped window reveal.  Using a coving tool, neatly create an internal cove finish.

v. Remove masking tape from joinery leaving a 100% water proof seal.

vi. This peocedure is repeated after rendering and prior to texture coating, to ensure double sealing around windows and doors.

(B) External Beads

i.   External points of building, columns etc.

ii.   All sill, head and jambs (60mm, 75mm, 100mm)

iii.   Install external bead by applying a bead of Bostik No More Nailst o internal sides of the bead.

Then press firmly into position, check for plumb and straightness, scraping of excess glue, tacking into position until dry.

(c) 40mm Reveal Bead

i.   Allow a 3mm gap between Greenboard and opening .

ii.   Glue 40mm reveal bead into 3mm gap pressing firmly against the Greenboard.  Make sure there is sufficient glue to fix beadto Greenboard.

iii. Tape and prime reveal bead and opening reveal.   Apply a bead of sealant into the gap between the reveal bead and opening reveal.  Smear sealant with tool.  Remove tape and Paint.

(d) Expansion Beading Joints

Expansion Joints allow movement within the building & avoid unsightly cracking.

i.   Vertical Expansion Beading Joints: Every 8 metres (above/ below window)

ii. Horizontal  Beading Expansion Joints: Located between floor levels.

iii. Install ‘Render Expansion Bead’ between both Greenboard surfaces, applying a bead of No More Nails to both internal surfaces of bead.  Press into position, scrape off excess glue, and tack fix until dry.

(Expansion Joints) Option 2

i. Chalk line after render

ii. 10mm cut through render and into panel

iii. Tape either side of joint

iv. Seal

v. Remove tape  and Paint

Find Out More